CFU1-CFU4 |
INTERMEDIATE CONNECTING FACILITY ASSIGNMENT USE 1 THROUGH 4 |
INDICATES: |
The intermediate connecting facility assignment is a provider carrier system. |
DATE: |
3/13/2008 |
BILLING: |
CRIS and CABS |
APPLICATIONS: |
Access Service, Access Service Request (ASR), Synchronous Optical Network (SONET) |
SECTION - POSITION |
EXAMPLES |
S&E - FL |
|
IG1 CLF 101 T1 LSANCAMPH01 |
FID RULES/CONSTRAINTS: |
|
SERVICE ORDER ACTIVITY NOTES: |
|
REFERENCES: |
|
SECTION - POSITION |
APPEARANCE |
MODE |
MIN |
MAX |
S&E - FL |
Required |
Alphabetic |
1 |
1 |
Element: 1 |
Carrier System |
Appearance |
Mode |
Min |
Max |
Series |
Range |
Required |
Alphabetic |
1 |
1 |
No |
No |
Code Set: |
||||
|
ORDER TYPE/ACTION CODE/FID RELATIONSHIPS |
Order Section - Position: S&E - FL
|
Order Type |
N |
T |
F |
D |
C |
R |
X |
P |
A |
Presence |
O |
O |
O |
O |
O |
O |
O |
P |
P |
Action Codes |
I,E |
I,E |
O,D |
O,D |
I,O, C,T, D,E, M,R, X |
I,O, C,T, D,E, M,R, X |
I,O,C,T,R |
- |
- |
Other FIDs Required Logical Line |
ICF1 THRU ICF4 |
ICF1 THRU ICF4 |
ICF1 THRU ICF4 |
ICF1 THRU ICF4 |
IFC1 THRU ICF4 |
ICF1 THRU ICF4 |
ICF1 THRU ICF4 |
- |
- |
CRIS |
CABS |
|
Data Retention |
Yes |
Yes |
Printed on CSR |
Yes |
Yes |
Note: Please refer to BR-751-000-150 for a complete description of a FID specification and its structure. |
iconectiv Confidential - Restricted Access This document and the confidential information it contains shall not be distributed, routed or made available to any third party, except with written permission of iconectiv. |
Licensed Material - Property of iconectiv Possession and/or use of this material is subject to the provisions of a written license agreement with iconectiv. |